In December 2023, TTK successfully completed the general overhaul of the Siemens 10 MW turbogenerator and its associated condenser at the MM Količevo paper mill in Slovenia. The maintenance activities covered both the stator and rotor components of the turbine and generator, the oil system with its pumps and coolers, as well as the regulation and protection elements. Additionally, all pipes in the condenser were replaced













